Non Workday Control
What is it?
Non-working days is a unique feature of the Task Sensor. This feature allows you to set days that are considered non-working for the whole team.
Unique insights and benefits
Every project comes with auto-configured non-working days. Those days are Sunday and Saturday. This is fully customizable. You can choose any day of the week as non-working or turn the weekends into working days.
You can set exceptions as "off" or "on". "Exceptional On" means working on a non-working day, while "Exceptional Off" means not working on a usual workday.
Exceptions can be documented within three days post-factum and with no limits pre-factum.
The task that overlaps with a Non-working day will get accordingly splitted and adjusted to be placed right after the non-working days.
Having the non-working days documented allows you to see real due dates with no configurations whatsoever.
You can set and mark some specific days as recurring. Those dates will repeat being non-working days annually.
The changes in settings apply only to the future. Feel free to adjust your work schedule without worrying about past data.
How to use
It is on by default. You are good to go.